Short answer: it depends what you’re touching. A lot of interior fit-out work in an existing shop or office is exempt from building consent. New shelving, simple low partitions and redecorating usually are. Anything that touches the structure, sprinklers, fire alarms, exit signage, a firewall, a masonry wall or the plumbing needs one. And whatever the council says, your landlord needs to say yes separately.
If you’re staring at a keys-in-hand shop and a Pinterest board, the paperwork isn’t the fun part. But it’s the part that decides whether you open in March or June, so here’s how to sort it out before you spend a dollar.
Is a shop fit-out exempt from building consent in NZ?
Often, yes, for the inside. Schedule 1 of the Building Act 2004 lists work that doesn’t need consent, and one exemption covers interior alterations to existing non-residential buildings like shops, offices and factories. MBIE’s building.govt.nz guidance sets out the conditions. The work must not:
- change or affect the building’s primary structure;
- change any specified system, such as sprinklers, fire alarms, exit signage or final exits;
- involve a firewall or a masonry wall built of bonded units joined with mortar;
- include sanitary plumbing or drainlaying.
The guidance gives examples of what stays exempt: a clothing store fit-out with new shelving, clothes racks and simple low partitions, or a restaurant that adds seating and extends the bar without touching the structure or fire systems. And examples that need consent: putting a fire door in a firewall, or installing full-height partitioning that means relocating sprinkler heads.
Two traps catch tenants out:
- New walls near sprinklers and detectors. Even non-load-bearing partitions placed near sprinkler heads or smoke and heat detectors can affect how those systems work, and MBIE says that kind of work will almost certainly need consent.
- A newly built shell. The same guidance says fitting out a tenancy in a newly built shell is new work, not an alteration, so the exemption doesn’t apply.
Exempt doesn’t mean unregulated. The work still has to comply with the Building Code. It just doesn’t need the council’s sign-off in advance. If you’re unsure, MBIE suggests asking a registered architect, registered building surveyor or chartered professional engineer, then your local council.
What’s the difference between landlord consent and council consent?
They’re two entirely separate permissions, and the mix-up is where most fit-out schedules go wrong.
| Council consent | Landlord consent | |
|---|---|---|
| Comes from | Building Act 2004 | Your lease |
| Asks | Is the work safe and Code-compliant? | Do we agree to you altering our building? |
| Can you skip it? | Only if the work is exempt | Not if your lease requires it, and most do |
| Can one replace the other? | No | No |
An exempt fit-out can still need written landlord approval. Many leases also let the landlord see the plans, or the council consent, before work starts. Look in your lease for the alterations clause: what needs consent, what drawings they want, whether they can ask for your plans to be certified, and what make-good you’ll owe when you leave. That last point matters for your numbers, because anything you build might have to come out again. (Our guide to buying the building you lease shows what changes if you own rather than rent.)
What if I’m changing what the shop is used for?
Then the paperwork widens. Under section 114 of the Building Act an owner must give the council written notice before changing a building’s use, and failing to do so is an offence. A change of use occurs when the new use carries more onerous or additional Building Code requirements than the old one (MBIE).
A common example: turning a retail unit into a café or restaurant. Councils treat eating places as places of assembly, which means fire safety and disabled access come into play. Applications that affect fire safety can go to Fire and Emergency New Zealand, which has 10 working days to advise of requirements such as means of escape. You may also need the building’s compliance schedule amended if your work affects an existing specified system.
What does “section 112” mean for my fit-out?
If your work needs consent and the building is existing, the council must be satisfied that after the alterations the building will comply “as nearly as is reasonably practicable” with the Code on means of escape from fire and, where required, access for people with disabilities, and won’t be worse off on other Code provisions. In plain English: a small shop alteration can trigger upgrades in the rest of the building. Councils commonly ask applicants for a gap analysis showing what’s there, what a new building would need and what you propose. Commercial alterations get a closer look than residential ones.
That is why “just a quick consent” sometimes turns into a fire-engineer’s report. Ask your designer or builder early whether anything in your plan could trigger it.
How long does building consent take?
The council has 20 working days to process an application under section 48 of the Building Act. But the clock stops whenever it asks for further information (an RFI) and doesn’t restart until the answer is enough to decide. MBIE’s 2022 evaluation of the consent system noted that most consents are processed inside the 20-day timeframe, but with many held pending more information, actual elapsed times are likely to be much longer.
So for planning, think of it as 20 working days of the council’s time, plus however long it takes you and your designer to answer each question, plus the time needed to prepare the application, plus the build. Councils publish their own processing figures, so check your local council’s before you set an opening date.
How do delays blow the budget, and how do you stop them?
Rent and wages don’t pause for consent. A three-week delay on a shop paying rent and a trained team on the payroll is real money. A few habits help:
- Ask first. Ring the council’s duty building officer or get a professional’s one-line opinion on “exempt or not” before you commit to a designer.
- Order of operations: landlord approval of the plans, then council (if needed), then builder start, then equipment and stock delivery. Don’t order long-lead fixtures before approvals are in unless you can cancel.
- Pad the schedule and the budget. Add contingency for consent fees, engineer’s reports and a month of slip. How much depends on your project, but a fit-out with no contingency is a plan, not a budget.
- Stage the money. Draw funding as work reaches each milestone, rather than all at once up front, so you aren’t paying interest on cash that’s sitting in the bank.
- Keep the paper trail. Approvals, drawings and the compliance paperwork matter at lease end, for insurers and when someone buys your business.
Fit-out costs landing earlier than the takings? Check your options in about a minute →
A worked example: a café taking over a retail unit
This is an illustration, not a real client.
Aroha is converting a 90 sqm gift shop in a suburban Dunedin strip into a café. She’s leasing, with a four-year term and a right of renewal.
- Use: retail to café is likely a change of use, so she gets the owner to notify the council and asks about fire and access.
- Work: a new counter, joinery and floor are exempt-type work. Taking out a partition that sits next to the sprinkler line isn’t. That part will almost certainly need consent.
- Landlord: her lease requires written approval of alterations and make-good at the end. She sends drawings early, and the landlord asks to see the consent before work starts.
- Timeline: she assumes consent will take two months, not 20 working days, and plans for the café to open after that.
- Money: the unavoidable costs come early: designer, consent fees, deposits for joinery, the coffee machine. The takings don’t arrive until opening. She stages the funding so most of it is drawn when work starts.
The numbers that matter aren’t the consent fee. They’re the weeks between signing the lease and the first coffee sold.
When shouldn’t you fit out a leased space?
Sometimes the honest answer is not to. Think again if:
- your lease has under two or three years left and no right of renewal, because you’d be paying off a fit-out you may not get to use;
- the make-good clause would have you pulling out everything you built;
- the landlord wants alterations certified, and the cost of that is a large slice of the budget;
- the property has deeper issues, such as an earthquake-prone building notice, that could land on your plans.
A cheaper “refresh” that stays inside the exemption can be the smarter move. Our guide to how much a small business should borrow and our page on when not to borrow can help you test it. If you’re leaving a fitted-out space, our guide to moving business premises covers the make-good bill.
Ready to fund the fit-out? Let’s talk it through
Once you know which approvals you need and how long they’ll take, the money side is much easier to plan. If you’re renovating or fitting out premises and want funding that lines up with the real timeline, we can look at an unsecured loan or line of credit based on your turnover and bank statements, or a property-secured loan for bigger projects. Have a look at our page on renovating or fitting out premises and the paperwork checklist to see what’s worth having to hand.
Here’s what you can expect:
- It takes about a minute to enquire, and there’s no credit check just for asking. Your credit score stays where it is.
- We don’t send your details to a pile of lenders. No spray and pray, no strangers ringing.
- A real person reads your situation, your lease, your plans and your timing, and calls you to talk it through.
- Please fill the form in accurately, so we can match the right option first time.
Ready when you are
Check your options in about 60 seconds
A few quick questions. Asking won't touch your credit file, your details go only to the specialist who suits your enquiry, and a real person reads every one.
Thanks, that's with us.
Keep your phone close: the specialist who suits your loan normally rings within a working day.
And if you do need funding…
That's where we come in. Tell us what's going on and we'll match you with a lender from our panel that fits — and tell you honestly if borrowing isn't the right move.
Quick questions
Do I need building consent to fit out a leased shop in NZ?
Often not for the interior work. Schedule 1 exempts many interior alterations to existing non-residential buildings, such as new shelving, simple low partitions and redecorating. It doesn't cover work that affects the primary structure, specified systems like sprinklers, fire alarms and exit signage, firewalls, masonry walls or sanitary plumbing and drainlaying. Fitting out a tenancy in a newly built shell is treated as new work and needs consent.
Is landlord consent the same as council consent?
No. Council consent is about the Building Act and Building Code. Landlord consent comes from your lease, which usually restricts alterations. Having one doesn't give you the other, so you need both where both apply.
How long does a building consent take?
The council has 20 working days to process an application, but the clock stops each time it asks for more information and restarts when the answer is sufficient. In practice, applications that need a request for information take longer, so build in slack rather than relying on 20 days.
Does changing what my shop is used for need consent?
It needs written notice to the council before you change the use, and consent if the change involves building work that needs it. A change of use is when the new use has more onerous Building Code requirements than the old one. Turning a retail space into a café is a common example, because eating places are treated as places of assembly.
What happens if I fit out without a consent I needed?
The council can issue a notice to fix, which can stop work and require you to rectify or retrospectively consent it. Unconsented work can also cause problems at lease end, with insurers and when you sell the business. It is far cheaper to ask first.
Can I borrow to fund a fit-out while waiting for consent?
Yes, but plan the drawdown around the timeline. Borrowing before the approvals are in costs you interest while nothing is being built. Staging the funding so it lands when the work starts keeps the cost down and the plan realistic.