Our building is earthquake-prone: should we strengthen, sell or move?

By the LendFriend editorial team · Updated 6 October 2026 · 8 min read

The short answer

Don't spend a cent until you've checked where your building lands under the reform Parliament passed in September 2026. Auckland, the Chatham Islands and the upper North Island's low seismic zone leave the system entirely, and from 1 July 2027 only unreinforced masonry and some 3+ storey concrete buildings in medium and high zones stay earthquake-prone. If yours stays in, compare the cost of the required work against selling or moving — then fund the option that leaves the business strongest.

Victorian stone and brick commercial buildings lining a Dunedin city street on a clear winter morning

Short answer: before you get quotes, check whether your building is still earthquake-prone at all. The reform Parliament passed on 18 September 2026 takes Auckland, the Chatham Islands and the upper North Island’s low seismic zone out of the system, and from 1 July 2027 only unreinforced masonry and some taller concrete buildings in medium and high zones stay in. If yours stays in, weigh the required work against selling or moving — then fund whichever leaves the business strongest.

If you own the building your business trades from — or lease space in one with a yellow notice by the door — the past few weeks have probably brought a mix of relief and confusion. Let’s slow it down and work through it like we would over a coffee.

What actually changed in September 2026?

The government says around half of the buildings currently designated earthquake-prone will come out of the system, and it puts the saving to owners and the economy at $8.2 billion (Beehive, 19 September 2026). The bill passed unanimously.

The changes arrive in two waves:

  1. The day after Royal assent: updated seismic zones take effect. Every existing earthquake-prone designation in Auckland, the Chatham Islands and the upper North Island low seismic zone is removed.
  2. From 1 July 2027: the rest kicks in. The old percentage-of-New-Building-Standard test goes, and a building is only earthquake-prone if it’s in a medium or high seismic zone and it’s either an unreinforced masonry (URM) building with a façade facing a public road or gathering area, or a heavy-material building (concrete or reinforced masonry) of three or more storeys.

There’s a catch heading the other way: Dunedin, coastal Otago and Stewart Island move from the low zone to the medium zone. A few owners there could find themselves in the system for the first time.

MBIE also says there will be three tiers of required work instead of one blanket standard (building.govt.nz):

Tier Typical building What’s required
Register and sign 1–2 storey URM in a small town or rural area Display the earthquake-prone sign; strengthening is optional
Façade risk mitigation 1–2 storey URM in an urban centre, or a 3+ storey URM in a small town Work to manage the risk of the façade collapsing
Targeted retrofit 3+ storey URM in an urban centre, or a tall heavy-material building with high-risk deficiencies Structural work to prevent collapse

And the requirement to upgrade fire safety and accessibility at the same time as seismic work goes too — something MBIE flagged as a real barrier when the bill was introduced (MBIE).

How do I find out where my building lands?

Three quick steps:

  • Check the seismic map. MBIE has a searchable map by address, so you can see which zone you’re in.
  • Find your current notice. Note the building’s construction type, number of storeys and your current deadline. For buildings that stay earthquake-prone, MBIE says deadlines “won’t change” unless you get an extension or an exemption applies.
  • Wait for the council letter — but don’t sit idle. Councils will notify owners of their updated status after 1 July 2027. Meanwhile, you can work out your likely tier and start planning.

If you’re a tenant, ask your landlord which tier they expect the building to fall into, and what they plan to do. Their answer affects your next few years as much as theirs.

Strengthen, sell or move: how do you choose?

This is where a calm, honest look at the numbers beats gut feel. Each option has a place.

When strengthening makes sense

  • You own the building, you love the location, and the business relies on that spot — foot traffic, a heritage look customers come for, or a fit-out that would cost a fortune to replace.
  • Your tier is façade work rather than a full structural retrofit, so the job is more contained than the scary quotes you got a few years ago.
  • Strengthening helps beyond compliance: some insurers price cover on seismic risk, some lenders set minimum ratings, and corporate or government tenants often want a better-rated building.

When selling makes sense

  • The required work would cost more than the building would be worth afterwards.
  • You were planning to retire or exit in the next few years anyway.
  • The building is a good site for someone with deeper pockets or redevelopment plans.

Selling an earthquake-prone building can take longer, and buyers will factor the work into their offer. Get a realistic appraisal before you decide.

When moving makes sense

  • You’re a tenant and the landlord isn’t planning to strengthen, or the building will be closed for months.
  • You’ve outgrown the space and the deadline is a good nudge to make a move you were already thinking about.
  • A better-located or better-rated site is available on sensible lease terms.

Moving isn’t free either: a new fit-out, signage, the move itself, maybe a bond or bank guarantee for the new landlord, and a quieter few weeks while customers find you.

Got a deadline, a quote and a decision to make? See if you qualify for funding that fits your plan →

A worked example: a two-storey shop in a provincial town

This is an illustration, not a real client.

Hemi and Sarah own a two-storey brick building on the main street of a provincial town in a medium seismic zone. They run a homewares store downstairs and rent the upstairs flat. The building has had an earthquake-prone notice for years, and the deadline was pushed out by the 2024 changes.

Under the new tiers, a 1–2 storey URM building in a small town falls into “register and sign”. They keep the sign, but strengthening becomes optional. The big quote they’d been dreading — for full strengthening plus fire and accessibility upgrades — is no longer something the law requires of them.

They don’t stop there, though. Their insurer has been cagey about renewal, and they’d like to borrow later to expand the shop. So they get an engineer to scope just the façade and parapet work, which is a fraction of the old quote. They fund it with a second mortgage over their home rather than the shop building, because lenders are much more comfortable with a house as security than with an earthquake-prone commercial building.

The lesson: the reform changed what they had to do. Their own goals decided what they chose to do.

How do people fund strengthening or a move?

Most owners use one of these, sometimes in combination:

  • A loan secured on property. If you or a supporting party own New Zealand property — a home, a rental, commercial property or land — a property-secured business loan from $20,000 up to $1m can fund strengthening, a fit-out or a move. It can sit as a first or second mortgage, even if there’s already a mortgage on the property. Our guide to first vs second mortgages for business explains the difference.
  • Securing it somewhere other than the building. If a lender won’t take the earthquake-prone building as security, offering another property is often the way through.
  • An unsecured loan or line of credit. For smaller jobs — façade work, moving costs, the gap while the shop is closed — businesses trading six months or more can be assessed on turnover and bank statements. Our secured vs unsecured loans guide helps you weigh it up.
  • Building in a buffer. Older buildings hide surprises. Work out the real number using our guide on how much a small business should borrow, then add a sensible contingency.

Ask your accountant about the tax treatment before you sign anything — whether spending is treated as repairs or capital can make a real difference.

What mistakes should you avoid?

  • Rushing into work you no longer need. If you’re in Auckland or the upper North Island low zone, or your building type drops out, the legal reason for the work may be gone. Pause and check.
  • Ignoring the deadline because “the rules are changing”. For buildings that stay in, the current deadline still stands.
  • Forgetting about tenants. If you’re the landlord, closing the building for strengthening can trigger rent abatement or let tenants leave. Read the leases first.
  • Borrowing for a building that doesn’t pay its way. If the business or the rent can’t carry the repayments, selling may be the kinder option. We wrote a whole guide on when not to borrow.

Ready to make the call? Let’s look at the money together

The reform has given a lot of owners breathing room — and a clearer idea of what the job really involves. Whether you’re strengthening a building you love, paying for façade work to keep your insurer happy, or moving the business somewhere new, the right funding turns a looming deadline into a plan.

We help owners borrow for premises decisions like this all the time, including when the building itself isn’t the best security. Have a look at our pages on renovating or fitting out premises and borrowing against your property, then tell us what you’re weighing up.

Here’s how it works:

  • About 60 seconds to enquire, and no credit check when you first enquire.
  • Your details don’t get sent to a pile of lenders. No spray and pray — your phone won’t light up with calls from strangers.
  • A real person looks at your building, your plans and your numbers, then calls you to talk through the options honestly — including whether borrowing makes sense at all.
  • Please fill in the form accurately. Tell us the building type, the deadline and roughly what the work or move will cost, so we can match you with the right option first time.

See if you qualify →

Ready when you are

Check your options in about 60 seconds

A few quick questions. Asking won't touch your credit file, your details go only to the specialist who suits your enquiry, and a real person reads every one.

What do you need the money for?

We don't charge you for this. Your details go only to the adviser or lender that suits your enquiry, never to a list.

And if you do need funding…

That's where we come in. Tell us what's going on and we'll match you with a lender from our panel that fits — and tell you honestly if borrowing isn't the right move.

Start my 60-second enquiry

Quick questions

Is my building still earthquake-prone after the 2026 reform?

It depends on where it is and how it's built. Buildings in Auckland, the Chatham Islands and the upper North Island low seismic zone come out of the system the day after the law receives Royal assent. Elsewhere, from 1 July 2027 only unreinforced masonry buildings and certain heavy-material buildings of three or more storeys in medium and high seismic zones remain earthquake-prone. Your council will tell you your updated status, and MBIE has a seismic map you can search by address.

Has my strengthening deadline changed?

For buildings that stay earthquake-prone, MBIE says existing retrofit deadlines won't change unless you're granted an extension or an exemption applies. Most deadlines that hadn't lapsed by 2 April 2024 were already pushed out four years by the 2024 amendment, so check the date on your current notice.

Do I still need a %NBS rating?

Not under the Building Act. From 1 July 2027, no building will be required by law to have a %NBS rating. Insurers, lenders and some tenants may still ask for one, so a recent engineering assessment can still be worth having.

Can I borrow against a building that's earthquake-prone?

Sometimes, but it narrows your options — many lenders discount or decline earthquake-prone security. A common workaround is to secure the loan on other New Zealand property instead, such as your home or a rental, through a first or second mortgage.

Should a tenant pay for earthquake strengthening?

Usually the building owner is responsible for the work, but your lease decides who pays for what, whether rent abates while the building is closed, and whether you can walk away. Read it with your lawyer before you agree to anything.

Will I have to upgrade fire safety and accessibility at the same time?

The reform removes the requirement for concurrent fire and accessibility upgrades when you do seismic work on an earthquake-prone building, which was a big part of the cost for many owners. The rest of the building consent process still applies.